Installation Questionnaire for Configuring UPS
Protection for Cisco Network Equipment Switches
and Routers
SBC Data Power Inc.
1760 Monrovia Avenue, Suite C8, Costa Mesa, Ca. 92627 USA
Phone 949 646-8191 Fax 949 258-5288
For Questions, contact: cthompson@sbcdatapower.com
Equipment and Facility Requirements Profiling Questionnaire:
What are the model numbers of your Cisco equipment ? ______________________
What are the quantities to be installed ? ___________________
In how many locations or rack lineups ? ___________________
What is the AC input voltage you want to power your equipment: __120 __ 208 __ 240
If known, what is the capacity in volt amps (VA) of the UPS you want: ___________________
What is your available electrical power at your facility ? ___ Single Phase ____ Three Phase
What is the available power in your data room / equipment room where your equipment is to be
installed ? ____ Single Phase _____ Three Phase ____ 120 ___ 208 ___ 240
What type of UPS chassis do you want ? ____ Rack Mount _____ Stand Alone
If rack mount, describe mounting configuration desired: _____ Two Post _____ Four Post
How much run time is required? __________________
Define electrical plugs your network equipment is using: (15, 20 amps, twist lock , straight blade)
See electrical charts for NEMA configurations _____________________________________
What is the future growth needed for this install ? __10% __25% __50%
Are their other servers / network equipment that will share the UPS output ? ________________
Are you looking for a redundant UPS system ? Yes ____ No _____
Is UPS Network Communication Required? (SNMP or RJ45) Yes ____ No _____
Does the installation site have the proper UPS input power and conduit in place? ________
Does the facility need the services of an electrician?
Does the installation site have the correct electrical receptacles for the connected equipment?
IE: NEMA 5-15R, NEMA 5-20R, NEMA 6-20R receptacles
Does the site require computer cabinets or a racking system ? Yes ____ No _____
What is the install date required ? _______________
Does this application require a cooling / air conditioning solution ? Yes ____ No _____
Is their a forklift or truck bay for offloading of the backup power system / UPS ?
Or is lift gate service required at time of delivery?
Does the customer need inside delivery service ?
Is the ship to same as the bill to ?
Return Link to Cisco Backup Power Product Page